BIM Modeling Cost by LOD: Price Every Discipline Before You Scope
BIM modeling cost is driven by the Level of Development (LOD 200 to 500) each trade needs, the floor area and the building type. Set them below to get a price range per discipline, plus Next Synergy's LOD matrix to align your team on what each level includes.
- Price range for Architectural, Structural and MEP trades
- Compare LOD 200, 300, 350, 400 and 500
- Free LOD matrix (PDF) for your BIM Execution Plan
Build Your LOD Matrix, Get Pricing per Discipline
Set a different LOD for each trade, the way your BIM Execution Plan does. Add your details to unlock the pricing, then adjust and compare live.
Building type
Gross floor area
Trades and LOD
Turn on at least one trade to see pricing.
Tip: a common split is Architectural and Structural at LOD 300 with MEP at LOD 350 for coordination.
How the Calculator Works
From scope to per-discipline pricing in three steps.
Pick trades and LOD
Choose the building type, floor area, the trades to model and the LOD each one needs.
Share your details
Add your name and work email to unlock pricing. We send it to you with the LOD matrix.
Get pricing per discipline
See a price range for every trade, then request an exact quote from our BIM team.
The NxtSyg LOD Matrix
What gets modeled at each LOD, element by element, for every trade. Use it to write your BIM Execution Plan and keep consultants aligned on deliverables.
| Element | LOD 200 | LOD 300 | LOD 350 | LOD 400 |
|---|---|---|---|---|
| Walls Architectural | Generic wall, approximate thickness | Specific wall type, actual thickness and layers | Adds openings and connections to slabs | Adds framing and fixings for fabrication |
| Framing Structural | Grid and approximate member sizes | Member sizes and locations | Adds connections and embeds | Adds shop-level connection detail |
| Ductwork Mechanical | Approximate routes and zones | Sized ducts at actual locations | Adds hangers, supports and clearances | Adds fittings and spool-level detail |
| Pipework | Routes and zones placeholder | Sized pipes placeholder | Supports and slopes placeholder | Fittings and spools placeholder |
| Cable trays | Tray zones placeholder | Sized trays placeholder | Supports and bends placeholder | Fabrication detail placeholder |
The full matrix covers [N] elements across Architectural, Structural, Mechanical, Electrical, Plumbing and Fire Protection, at LOD 200 to 500.
Which LOD Fits Your Design Stage?
Model only to the detail your stage needs. Going higher than required adds cost without adding value.
Why Design Teams Work With Next Synergy
Our team models in Revit, Navisworks, AutoCAD and Dynamo for architects, engineers and contractors across the USA, UK, Europe and India. We follow your BIM Execution Plan, templates and LOD requirements.
BIM Modeling Cost by LOD: FAQs
How much does BIM modeling cost per square foot by LOD?
It depends on the trade, the LOD and the building type. At Next Synergy, architectural modeling at LOD 200 starts from [$X] per sq ft, and MEP at LOD 400 can reach [$Y] per sq ft. Use the calculator above for a range per discipline.
What is the difference between LOD 300 and LOD 400?
LOD 300 models elements at their actual size, shape and location for design and documentation. LOD 400 adds fabrication and assembly detail, such as connections and spool information, so it takes more modeling time and costs more.
Can different trades be modeled at different LODs?
Yes, and it usually saves money. Many teams model architecture and structure at LOD 300 and MEP at LOD 350 for coordination. The LOD matrix helps you set this per trade in your BIM Execution Plan.
Which LOD do design teams usually need?
LOD 200 for concept and schematic design, LOD 300 for design development, LOD 350 for construction documents and coordination, LOD 400 for fabrication and LOD 500 for as-built handover.
What is included in the NxtSyg LOD matrix?
An element-by-element breakdown of what is modeled at LOD 200, 300, 350, 400 and 500 for architectural, structural, mechanical, electrical, plumbing and fire protection trades. You get it by email after using the calculator.
Is the calculator price final?
No. It gives an indicative range. We confirm a fixed quote after reviewing your drawings, BIM Execution Plan and deliverable list.
Scoping a BIM project?
Share your drawings and BIM Execution Plan. We'll confirm LOD by trade and send a fixed quote.