Construction rework can lead to a budget leak due to wasted labor and schedule delays. Research suggests that rework also accounts for 7% of total working time.​

Scan-to-BIM services solve this by replacing outdated assumptions with millimeter-precise digital twins. By capturing 100% of site conditions before design begins, teams can identify conflicts in a virtual environment rather than on the job site.​
In fact, studies and project reports suggest that when scanning is integrated early into quality control and coordination workflows, rework can drop by around 40–45%.
It is therefore necessary to evaluate how you’d use the Scan to BIM services to reduce rework costs.
Let’s find out!
How Scan to BIM Directly Improves Cost
Scan to BIM converts physical site data into a millimeter-precise Revit model, eliminating the financial risks of outdated as-built documentation. Teams know what is Scan to BIM, and why it is important, which is why successful teams work with accurate existing-condition data. Eventually, it helps drive fewer corrections later, bringing down rework and schedule disruption.
Here’s how it impacts:
Site verification time
Laser scanning reduces the need for repeated site visits. Teams rely on captured data rather than manual field checks, reducing the time spent measuring conditions on site.
Reduced Design Revision Load
According to the Global Infrastructure Hub, similar digital twin and reality capture integrations significantly accelerate task completion and reduce the administrative burden of design corrections.
Clash-Driven Change Prevention
Early automated clash detection helps you pinpoint any space-related conflicts in the virtual model before they reach the field. Virtually resolving these issues can prevent field change orders, which typically cost thousands of dollars in emergency labor and material waste.

How Scan to BIM Can Drive 40% Reduction in Rework
While there are challenges in starting a scan to BIM project, the rewards of committing to one are equally rewarding. Studies from scanning and engineering workflows show that design cycle effort can be reduced by up to 75% when teams rely on scan-derived models instead of repeated physical checks.​
The 40% reduction in rework linked to Scan to BIM is a direct result of moving from reactive site management to proactive digital coordination.Â
Here’s how it happens.
Drive Automated Clash Detection
Detecting clashes automatically requires implementing a process that uses specialized software like Navisworks or Revizto.
Scan to BIM for clash detection –
- Allows clash detection to run against the actual site geometry
- Eliminate false positives caused by outdated drawings
- Reduce coordination cycles spent validating field conditions
Set and Follow Accuracy Benchmarks
Scan to BIM provides a level of precision that traditional surveys cannot match. Laser scanning captures existing conditions at millimeter-level precision, providing a measurable benchmark for design and coordination work.
Reports by Arkance: BIM-based clash detection typically reduces rework costs by up to 40% of the total project budget, ensuring prefabricated components fit perfectly on the first attempt.
Here’s how Scan to BIM boosts the accuracy benchmarks:
- A report from Dodge Construction Network shows that firms integrating reality capture experience a 73% reduction in errors and rework
- Moving to LOD 350 or 400 ensures the model contains the exact fabrication data needed for field installation
- High-resolution capture of structural and spatial conditions
Replacing Inferred Site Conditions With Verified Geometry
One of the most direct ways Scan to BIM reduces rework is by removing inference from the design process. In conventional projects, teams often rely on legacy drawings or partial surveys to model existing conditions.
Scan to BIM replaces these guesses with verified geometry, revealing what is actually behind walls or above ceilings.
This transition directly results in:
- Fewer Redraw Cycles: Teams design from scanned site data that helps avoid the need to rebuild layouts when field conditions differ from older drawings.
- Reduced RFIs: Teams rely on verified site models. That’s why most questions about dimensions get resolved before construction begins to reduce back-and-forth between the site and design teams.
- Eliminated Change Orders: Conflicts are resolved during coordination because the model reflects what exists (not what was assumed), helping limit late changes during construction.
Leveraging Mechanics of Cost Reduction
Scan-to-BIM does not reduce rework in a single action. Instead, it lets multiple cost-control mechanisms gain greater traction throughout the project lifecycle. These mechanics work subtly, but their financial impact is substantial.
Here’s how Scan to BIM can help reduce the cost
- Verified models allow MEP components to be built in a factory, that help reduce on-site installation time
- Known quantities and layouts can reduce over-ordering and on-site cutting. When components are fabricated to accurate dimensions, material waste declines, thereby directly affecting Scan to BIM costs.
- Remote verification helps stakeholders inspect site conditions virtually to reduce the cost and time of travel for engineers and architects
Strategic Delivery with Next Synergy Solutions
Cost control depends on how scan data is converted into usable models and how early those models influence decisions. This is where you need technical support to turn complex site data into actionable assets.
Next Synergy Solutions approaches Scan to BIM as a cost-management workflow rather than a standalone service. The focus is on producing models that reduce downstream effort, not on over-modeling for visual completeness.
Here’s how our team ensures high-level efficiency with Scan to BIM services.
Specialized workflows
Next Synergy structures Scan to BIM deliverables around how teams actually use models during design and coordination. That’s how we make sure to limit unnecessary detail and keep modeling effort aligned with decision needs.
Sector Expertise
Our experience across the Healthcare, Commercial, and Industrial sectors enables us to understand the specific requirements of system-heavy renovations. We have team experts who navigate regional building codes and complex structural constraints to deliver BIM modeling services that produce scalable models that drive confidence in decision-making.
Conclusion
Rework is expensive because it arrives late, when fixes cost more and options are limited. Scan to BIM shifts certainty forward by grounding design and coordination in verified site data. By replacing manual assumptions with verified geometry, firms can reduce rework by 40% and eliminate the primary causes of budget overruns.
Ready to eliminate field surprises and lock in your project budget?Â
Contact Next Synergy Solutions today to see how our specialized Scan to BIM workflows can secure your construction ROI.